How the day runs.
The order is the same for a company on its own day and for a bootcamp. Valavia runs the ground, the airspace and the record. You run the system.
Ahead
The question is agreed in Teams before you travel.
Valavia meets you to learn the technology and what you want measured. The schedule comes ahead of the day, and the NDA is signed electronically when that is possible. Filming is agreed in writing before anything is published.
ATechnology readiness level (TRL). A preliminary level is assessed.
BYour own marketing specification. Three parameters are defined, and the day measures those.
Open
The ground is ready before the first run.
The workshop is open, and the safety arrangements are in place.
Brief
Nothing in the field starts until safety is signed off.
An opening briefing, then the safety briefing. Everyone on site signs it, including people who are only there to support.
Define
That decision is written into the record.
Before the judged runs, the Teams agreement goes into the record: the preliminary readiness level, or the three parameters and the conditions they have to hold in. Later results are read against that list.
Test
Runs go out in slots. Fixes stay on site.
Runs are coordinated, and a clear spectrum can be held when a measurement needs it. Between runs the workshop stays open, so the system can be changed and sent back out. A night window is scheduled when the test needs darkness.
Close
The record is closed before you leave.
Validation is written against the measures for the day. Pass or fail, the result stays tied to the conditions it was measured in. The names for the certificate are collected before you leave, and the report or certificate follows from that record.
